Purchase building & fix structural issues.
Secure building and repair roof & tuckpoint loose block.
Start work summer 2021.
Begin to renovate shell of the 1st floor retail spaces for appropriate tenants/businesses.
Secure windows.
Front façade restoration.
East Storefront restoration.
Renovate West Storefront and facade.
Update electrical and HVAC for both first floor storefronts and accompanying lobby.
Add bathrooms off the lobby and configure entrances to be handicap accessible. The eventual elevator installation will make the entire building accessible.
Start work Q1 2022. (Completed Summer 2024).
Restore all upper-level windows, maintaining originality (2nd & 3rd Floor, Current primary objective as of May 2025.)
Install new electrical & HVAC on the entire 2nd Floor, to eventually serve the offices, share spaces, etc.
Repair and restore 100+ year old terrazzo flooring and original fir flooring where applicable.
3rd Floor renovation, HVAC, Electric.
Install elevator servicing all floors, accessible by rear lobby.
Time frame to be determined based on funding.
Basement "Storefront" restoration.
Address all other building-wide outstanding projects.
Time frame to be determined based on funding.